Testing confirms more than continuity
Optical tests help confirm route loss, splice performance and whether the completed path aligns with the design and acceptance criteria.
Records protect future decisions
Route plans, fibre allocation, splice diagrams, asset locations, warranties and approved changes reduce time lost during faults or expansion.
Agree acceptance before construction
Test methods, formats, tolerances, naming and approval responsibilities should be defined before the network reaches handover.