Know what is already in the ground
Available utility records, surface evidence, detection equipment and controlled excavation help reduce the risk of damaging existing services.
Manage the work area
The site plan should address pedestrians, traffic, property access, spoil, dust, noise, weather and daily housekeeping.
Reinstatement is part of the build
Surfaces must be restored to the agreed standard and defects closed promptly. Good records establish what was opened, installed, inspected and reinstated.
Use the guide as a starting point.
Every route, organisation and regulatory environment is different. Share the location and project objective with African Dream for a more specific discussion.
Speak to our team ↗