Building the network

The main stages of a fibre construction project

Follow the controlled path from mobilisation and civils to testing, records and handover.

01

Mobilise with approved information

Construction should begin from an approved route, work pack, safety plan, permissions register and stakeholder communication plan.

02

Build and install

The field sequence can include work-zone setup, trenching or pole preparation, ducts and chambers, cable placement, jointing, splicing and reinstatement.

03

Prove and close

Inspection points, optical testing, defect closure, as-built records, asset information and acceptance documentation turn completed work into an operable network.