Describe the required outcome
Name the sites, users, services, capacity, resilience, handover and support expectations without prescribing details that require engineering.
Define boundaries and interfaces
Clarify route assumptions, existing assets, approvals, power, equipment rooms, third parties, customer responsibilities and excluded work.
Make acceptance measurable
State technical standards, inspections, testing, documentation, defects, training, warranties and the evidence required for completion.
Use the guide as a starting point.
Every route, organisation and regulatory environment is different. Share the location and project objective with African Dream for a more specific discussion.
Speak to our team ↗