Ask for the control system
Understand how work is planned, people are verified as competent, hazards are controlled and permits or work packs are issued.
Follow the evidence
Ask how inspections, photographs, material records, tests, non-conformances, incidents and corrective actions are recorded and reviewed.
Check the whole delivery chain
Subcontractors should work to the same safety, quality and documentation requirements, with one accountable route for escalation and acceptance.
Use the guide as a starting point.
Every route, organisation and regulatory environment is different. Share the location and project objective with African Dream for a more specific discussion.